马尔马拉铁路(Marmaray)起于亚洲的盖布泽(Gebze),止于欧洲的哈卡里(Halkalı),全长76.3 km,采用25 kV 50 Hz AC供电,日本银行、欧洲投资银行(European Investment Bank)和欧洲发展银行理事会(the Council of Europe Development Bank)为该项目提供3.5亿美元的贷款。
• 新建隧道13.6 km(Underground section of the alignment: between Ayrilikcesme-Yedikule 13.6 km)
• 设40座车站(Total number of stations on the alignment: 37 above ground, 3 underground stations)
• 8座换乘车站(Transfer stations for InterCity trains: 8)
• Ayrilikcesme至Kazlicesme区间为双线(Tracks between Ayrilikcesme-Kazlicesme: 2)
• 预计单向输送旅客7.5万人次/时、100万人次/天(Number of passengers in one direction: 75,000)
• 隧道沿Sarayburnu(后宫)-Salacak线修建(Immersed tube tunnel alignment: between Sarayburnu-Salacak)
• 沉管隧道全长1.387 km(Length of immersed tube tunnel: 1,387 m)
• 隧道最深处达60.46 m(Deepest point of the immersed tube tunnel alignment: 60.46 m)
• 最大坡度18‰(Maximum vertical track gradient: 1.8%)
• 设计最高时速为100km/h(Projected max speed: 100km/h)
• 站台长225m(Platform length: 225m)
• 最小发车间隔可达到2分钟(The headway between train operations in the alignment: 2 Minutes)
• 除锡尔凯吉外,所有车站均为岛式月台(All stations have a central platform except for Sirkeci station which has side platforms)
停在海达尔帕夏车站(Haydarpaşa Terminal)的工程车
|