Itany 发表于 2012-9-24 23:50 
求新闻链接。
另问是否方便转发。
未见新闻链接,只是准备投标阶段,摘录几句你关心的问题。
1,应用线路方面。
……to ensure that they shall be operated safely / comfortably on each railway lines (Ankara-Konya-Ankara and Ankara-İstanbul-Ankara) where they are expected to be operated.
2,某线路运行速度
(in case of the rehabilitation of the Polatlı-Konya Line section to the speed of 300 km/h)
3,既有线兼容性。
The information about track, signalization and electrification of existing railway lines between Hasanbey - Eskişehir are given in …… ……improve the existing line between Ankara-Sincan within the scope of Başkent ray Project and information for the track, electrification and signalization of the planned railway line is given in…… |